Frequently Asked Questions
Sealed drawings, fees, timing and what we need from you
A seal tells the building department that a licensed Professional Engineer prepared or thoroughly reviewed the drawings and takes professional responsibility for them. It is what allows the authority to rely on the design.
In many cases, yes. We first review the design and calculations against the building code. If anything needs to change, we tell you exactly what and why. Once the engineering is right, we seal it. We never seal work we have not reviewed.
Raed Azouz, P.Eng., is licensed in Ontario (PEO), British Columbia (EGBC), Alberta (APEGA), and the Northwest Territories and Nunavut (NAPEG). Drawings must be sealed by an engineer licensed where the project is built, so please tell us the project location when you get in touch.
Just the basics: the project address, a short description of the work, and any drawings, sketches or photos you already have. If the building department has sent comments, include those too. The more we see up front, the more accurate your quote will be.
Every project is different, so we do not guess. Once we understand the scope, we send you a written fee and timeline before any work starts, so there are no surprises.
One of our team members will get back to you within 1 business day of your quote or appointment request.
Of course. Book a phone or video call from the Contact page and we will go over what you need and what the authority is asking for.
Absolutely. We work with homeowners as well as builders, contractors, architects, designers and fabricators. If this is your first time hiring an engineer, we will walk you through what is needed and what happens next.
Something else? Ask the engineer directly.