P.Eng. licensed in ON · BC · AB · NT · NU

Licensed jurisdictions

Professional Engineer in 5 jurisdictions

AB

Alberta

Regulator
Association of Professional Engineers and Geoscientists of Alberta (APEGA)
Designation
P.Eng.
Registration no.
308591
NT

Northwest Territories

Regulator
Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists (NAPEG)
Designation
P.Eng.
Registration no.
2317
Licensed since
2025
NU

Nunavut

Regulator
Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists (NAPEG)
Designation
P.Eng.
Registration no.
2317
Licensed since
2025

PEO licence

Ontario licence certificate

Raed Azouz, licence #100547126. Scan the QR code on the certificate to verify it with PEO.

Download PDF Verify online

Professional Engineers Ontario licence certificate for Raed Azouz

EGBC licence

British Columbia licence certificate

Raed Azouz, registration #67391. Verify it in the EGBC member directory.

Download PDF Verify online

Engineers and Geoscientists British Columbia licence certificate for Raed Azouz

NAPEG licence

Northwest Territories licence certificate

Raed Azouz, registration #2317. Verify it in the NAPEG member directory. Search the last name Azouz (Reg. #2317).

Download PDF Verify online

Northwest Territories and Nunavut Association of Professional Engineers and Geoscientists licence certificate for Raed Azouz

The seal

What a P.Eng. seal means

A seal means the engineer prepared or thoroughly reviewed the work and takes professional responsibility for it. It cannot just be added to a finished drawing.

  • Licensed where the project is built
  • Work prepared or thoroughly reviewed
  • Changes after sealing go back to the engineer

Getting started

What to send us

  1. Project address
  2. Drawings, sketches or photos
  3. Any calculations, reports or authority comments
Send your project details

Review to seal

How a drawing gets sealed

  1. 1

    Tell us about the job

    Send drawings or a description and the project location. We reply with a written scope and fee.

  2. 2

    Design and review

    We do the calculations and prepare or review the drawings against code.

  3. 3

    Signed and sealed

    Once the work meets code, the engineer seals it for permit or construction.

  4. 4

    Through construction

    Site questions, field reviews and the final letters to close the permit.

Need drawings reviewed and sealed?

Tell us about the project. We will reply with a scope and fee.